Stipple Epoxy Coating System (3506)

Download Editable Guideline Specification

System Bulletin (Acrobat PDF Format)

Product Description
General Polymers EPOXY FLOOR COATINGS are high performance epoxy coatings that has been designed to provide a semi-gloss, flat, or stipple finish with above average chemical resistant protection. EPOXY FLOOR COATINGS offers protection against splash, spillage and fumes of many process chemicals, caustic cleaners, oils, fuels and acids. EPOXY FLOOR COATINGS provides attractive finishes and should be used wherever a high-build, protective coating is required.

Advantages
•Chemical and abrasion resistant
•High mil build per coat speeds project turnaround
•Good hiding
•USDA approved

Uses
• Warehouses
•Industrial plants

Return to top of page.

Typical Physical Properties

 

Mix Ratio A:B

2:1

Color

Standard Colors
Computerized custom color matching available upon request

Viscosity, mixed

130 ku

Solids, by volume 

100%

VOC (Volatile Organic Content)

-0-

Coverage @10 mils

160 sq. ft.

Pot Life, 1 gallon mass  @ 50° F
ASTM D 2471                    @ 73°F
                                             @ 90° F

185 minutes 
40 minutes
20 minutes

Cure Time  @ 6 mils        Dry to touch 
                                             Recoat
                                             Light Traffic
                                             Full Cure

8-9 hours
14 hours min.
24 hours min.
7 days

Abrasion Resistance
ASTM D 4060

0.1 grams lost

Hardness, Shore D
ASTM D 2240

65

Resistance to 
Elevated Temperatures
 
MIL-D-3134J 

No slip or flow at required temperature of 158°F

Adhesion

350 psi

ACI 503R

100% concrete failure

Flammability
ASTM D 635

Self-Extinguishing over concrete

Gloss
60° Gloss Meter 
@ 73°F, 50% RH

90 + millage pts


 

System Specification

EPOXY FLOOR COATING SYSTEM as manufactured by General Polymers shall consist of 3579 Penetrating Primer as primer and different options as listed below as the seal coat.

3506 Stipple Epoxy Floor Coating
3543 Polyamide Epoxy Semi-Gloss
3547 Polyamide Epoxy Flat
3744P High Performance CR Epoxy

Part 1 - General

1.01 Work Included

A. Furnish necessary material, labor, and equipment required to prepare designated areas and install a Epoxy Floor Coating System.

1.02 Related Work

A. Drawings and general provisions of contract including General and Special Conditions and Division I, excepting special Submittal and Quality Assurance provisions in this section.

1.03 Quality Assurance

A. Manufacturer's Qualifications
Obtain Industrial Coating materials from a single manufacturer with a minimum of _____ years verifiable experience providing materials of the type specified in this section.

B. Contractor's Qualifications
Installation must be performed by a manufacturer certified contractor with skilled mechanics having not less than three years satisfactory experience in the installation of the type of system as specified in this section, and must be certified in writing by the manufacturer of the Epoxy Floor Coating System.

 

1.04 Warranty

A. The contractor and the manufacturer shall furnish a standard guarantee of the Industrial Coating System for a period of one year after installation. The labor and material guarantee shall include loss of bond and wear-through to the concrete substrate from normal use.

B. Not included in the warranty are damage due to structural design deficiencies including but not limited to slab cracking from lateral, vertical or rotational movement, and gouging or other damage due to fork lifts, other equipment, delamination caused by vapor transmission, Acts of God, or other elements beyond the scope of protection of this system nor causes not related to the system materials.

C. In case of a warranty claim, the owner will notify the manufacturer and contractor in writing within 30 days of the first appearance of problems covered under this warranty. The owner will provide free and unencumbered access to the area during normal working hours for warranty rework. Property protection is also the owner's responsibility. Remedy is limited to direct repair of the Epoxy Floor Coating System.

Return to top of page.

 

1.05 Submittal

A. System Data
Submit manufacturer's specifications on cured system and individual components of the Epoxy Floor Coating System, including physical properties and performance properties and tests described in part 2.01 B and submit Material Safety Data Sheets. Each individual component of the system will be evaluated on the basis of these standards. For any tests not listed in the manufacturer's standard nationally published data, the manufacturer must supply the missing data accompanied by the independent testing laboratory's test results which prove compliance in accordance with the referenced standard(s). Furnish _____ sets of this information. Manufacturer's standard color chart shall also be submitted and must afford the owner color selection from at least _____ standard colors and computerized custom color matching shall be available upon request. Furnish ____ sets of this information.

B. The contractor shall submit a 6" x 6" cured system sample which the contractor has made for verification purposes and finish texture approval.

C. Contractor Experience
The contractor shall furnish a list of projects using either specified material or equivalent that they have installed during the last _____ years. Information shall include: project name, square footage, owner contact name with owner’s address and phone number. Also, the contractor shall furnish resumes detailing the experience of key project personnel including supervisors and mechanics.

D. It is the intention of this Section to provide the products as named. Substitutions will be considered only when received by the Architect, Engineer or Design Professional through a bidding Prime Contractor at least ten days prior to the date set for receipt of bids. Upon receipt of any such submission, the Architect, Engineer or Design Professional will determine whether or not the proposed product is an equal. In the event the Architect, Engineer or Design Professional determines that a proposed system is an approved equal, he will issue an addendum and notify all bidders at least 48 hours prior to receipt of bids. No substitutions will be considered after contract bid date.

E. The contractor shall submit a copy of the manufacturer’s packing slip, tagged for this specific job, along with calculations, signed by an officer of the primary material supplier demonstrating that the quantity of material furnished for the project will achieve the specified coverage and mil thicknesses.

1.06 Material Delivery, Handling and Storage

A. Primary system materials shall be delivered in the manufacturer's undamaged, unopened containers. Each container shall be clearly marked with the following:
•Product name(s) and/or Number(s)
•Manufacturer's name
•Component designation (A, B, etc.)
•Product Mix Ratio
•Health and Safety Information
•CHEMTREC Emergency Response Information

B. Provide equipment and personnel to handle the materials by methods which prevent damage.

C. The contractor shall promptly inspect direct jobsite material deliveries to assure that quantities are correct, comply with requirements and are not damaged.

D. The contractor shall be responsible for materials furnished by him, and he shall replace, at his own expense, such materials that are found to be defective in manufacture or that have become damaged in transit, handling or storage.

E. Store material(s) in accordance with manufacturer’s instructions, with seals and labels intact and legible. Maintain temperatures within the required range. Do not use materials which exceed the manufacturer’s maximum recommended shelf life.

1.07 Job Conditions

A. The contractor shall visit the jobsite prior to beginning the installation of the Epoxy Floor Coating System to evaluate substrate condition, including substrate moisture content, and the extent of repairs required, if any. Concrete substrates shall be tested to verify that the moisture content of the substrate does not exceed Epoxy Floor Coating System manufacturers' recommendations. Cost of repair and remediation of the substrate can not be predicted prior to inspection and testing, and therefore is not encompassed within the installation estimates.

B. The contractor should exercise care during surface preparation and system installation to protect surrounding substrates and surfaces, as well as in-place equipment. The contractor shall prepare the substrate to remove laitance and open the surface. This shall be achieved by light brush grit blasting. Surface profile achieved shall be similar to medium grit sandpaper and free from bond-inhibiting contaminants. Costs incurred that are associated with damage from negligence or inadequate protection shall be the sole responsibility of the contractor.

C. Subfloor tolerances are specified in Section __________ (in accordance with ACI 302). Each drain in the installation area must be working and raised or lowered to the actual finished elevation of the Industrial Coating System.

D. System must be protected by the General Contractor or, as a separate bid item, by the installing contractor until it is inspected and turned over to the owner.

E. The minimum slab temperature must be conditioned to 50°F before commencing installation, during installation, and for at least 72 hours after installation is complete.

F. Maintain lighting at a minimum uniform level of 50 or more foot candles in areas where the Epoxy Floor Coating System is being installed. It is the recommendation of the manufacturer that the permanent lighting be in place and working during the installation.

G. Leaks from pipes and other sources must be corrected prior to the installation of the Epoxy Floor Coating System.

Return to top of page.

 

Part 2 - Products

2.01 Materials

A. System Overview
The Epoxy Floor Coating System as formulated by General Polymers shall be Epoxy Floor Coatings, consisting of 3578 Universal Penetrating Primer as primer and Epoxy Floor Coatings. The total system thickness will be 16-18 mils DFT nominal.

B. Typical Physical Properties @ 73°F (unless otherwise noted)

 

Typical Physical Properties

 

Mix Ratio A:B

2:1

Color

Standard Colors
Computerized custom color matching available upon request

Viscosity, mixed

130 ku

Solids, by volume 

100%

VOC (Volatile Organic Content)

-0-

Coverage @10 mils

160 sq. ft.

Pot Life, 1 gallon mass  @ 50° F
ASTM D 2471                    @ 73° F
                                             @ 90° F

185 minutes 
40 minutes
20 minutes

Cure Time  @ 6 mils       Dry to touch 
                                            Recoat
                                            Light Traffic
                                            Full Cure

8-9 hours
14 hours min.
24 hours min.
7 days

Abrasion Resistance
ASTM D 4060

0.1 grams lost

Hardness, Shore D
ASTM D 2240

65

Resistance to 
Elevated Temperatures
 
MIL-D-3134J 

No slip or flow at required temperature of 158°F

Adhesion

350 psi

ACI 503R

100% concrete failure

Flammability
ASTM D 635

Self-Extinguishing over concrete

Gloss
60° Gloss Meter 
@ 73°F, 50% RH

90 + millage pts


 

Part 3 - Execution

3.01 Surface Preparation

A. For thorough instructions regarding preparation of concrete substrates consult General Polymers "Instruction for Concrete Surface Preparation" (Form G-1).

 

3.02 Installation

A. General
Apply each component of the Epoxy Floor Coating System in compliance with manufacturer's written installation instructions and strictly adhere to mixing and installation methods, recoat windows, cure times and environmental restrictions. The Epoxy Floor Coating System is to be installed directly over non-moving control joints and cracks which have been treated with semi-rigid epoxy and the Epoxy Floor Coating System will terminate at the edge of isolation and expansion joints as designated by the Architect, Engineer or Design Professional. Integral cove base shall be installed where specified in the drawings.

B. Cracks
For information pertaining to the treatment of cracks in concrete substrates, consult General Polymers Concrete 102.

C. Control Joints
For information pertaining to the treatment of control joints in concrete substrates, consult General Polymers Concrete 103.

D. Isolation/Expansion and Other Joints Subject to Movement
For information pertaining to the above, consult General Polymers Concrete 105.

E. System Primer
3578 Universal Penetrating Primer

F. First Coat
Epoxy Floor Coatings

 

3.03 Curing, Cleaning and Protection

A. Cure Epoxy Floor Coating System materials in compliance with manufacturer's directions, taking care to prevent contamination during stages of the installation and prior to completion of the curing process.

B. Protect the Epoxy Floor Coating System from damage and wear during other phases of the construction operation, using temporary coverings as recommended by the manufacturer, if required. Remove temporary covering just prior to final inspection.

C. Clean the Epoxy Floor Coating System just prior to final inspection, using materials and procedures suitable to the system manufacturer. Some cleaners will affect the color, gloss or texture of your polymer floor surfaces. To determine how your cleaner will perform, General Polymers recommends that you first test each cleaner, in a small area, utilizing your cleaning technique. This precaution will demonstrate the effect of your cleaner and technique. If no deleterious effects are observed, continue with the procedure. If deleterious effects do occur, modify the cleaning material and/or procedure. For recommendations regarding types of cleaners, contact the Epoxy Floor Coating System manufacturer.

Revised: 4/02