Stipple Epoxy Coating System (3506)
Download Editable Guideline Specification
System Bulletin (Acrobat PDF Format)
Product
Description
General Polymers EPOXY FLOOR COATINGS are high performance epoxy coatings that has been
designed to provide a semi-gloss, flat, or stipple finish with above average chemical
resistant protection. EPOXY FLOOR COATINGS offers protection against splash, spillage
and fumes of many process chemicals, caustic cleaners, oils, fuels and acids. EPOXY FLOOR
COATINGS provides attractive finishes and should be used wherever a high-build,
protective coating is required.
Advantages
•Chemical and abrasion resistant
•High mil build per coat speeds project turnaround
•Good hiding
•USDA approved
Uses
• Warehouses
•Industrial plants
|
Typical Physical Properties
|
|
|
Mix
Ratio A:B |
2:1 |
|
Color
|
Standard
Colors |
|
Viscosity, mixed |
130 ku |
|
Solids, by volume |
100% |
|
VOC
(Volatile Organic Content) |
-0- |
|
Coverage @10 mils |
160 sq. ft. |
|
Pot Life, 1 gallon mass @ 50°
F |
185 minutes |
|
Cure Time @ 6 mils
Dry to touch |
8-9 hours |
|
Abrasion Resistance |
0.1 grams lost |
|
Hardness, Shore D |
65 |
|
Resistance to |
No slip or flow at required temperature of
158°F |
|
Adhesion
|
350 psi |
|
ACI
503R |
100%
concrete failure |
|
Flammability |
Self-Extinguishing over concrete |
|
Gloss |
90 + millage pts |
|
|
|
System Specification
EPOXY FLOOR COATING SYSTEM as manufactured by General Polymers shall consist of 3579 Penetrating Primer as
primer and different options as listed below as the seal coat.
3506 Stipple Epoxy Floor Coating Part
1 - General 1.01
Work Included A. Furnish
necessary material, labor, and equipment required to prepare designated areas
and install a Epoxy Floor Coating System. 1.02
Related Work A.
Drawings and general provisions of contract including General and Special
Conditions and Division I, excepting special Submittal and Quality Assurance
provisions in this section. 1.03
Quality Assurance A.
Manufacturer's Qualifications B.
Contractor's Qualifications 1.04
Warranty A. The
contractor and the manufacturer shall furnish a standard guarantee of the
Industrial Coating System for a period of one year after installation. The labor
and material guarantee shall include loss of bond and wear-through to the
concrete substrate from normal use. B.
Not included in the warranty are damage due to structural design deficiencies
including but not limited to slab cracking from lateral, vertical or rotational
movement, and gouging or other damage due to fork lifts, other equipment,
delamination caused by vapor transmission, Acts of God, or other elements beyond
the scope of protection of this system nor causes not related to the system
materials. C. In
case of a warranty claim, the owner will notify the manufacturer and contractor
in writing within 30 days of the first appearance of problems covered under this
warranty. The owner will provide free and unencumbered access to the area during
normal working hours for warranty rework. Property protection is also the
owner's responsibility. Remedy is limited to direct repair of the Epoxy Floor Coating System. 1.05
Submittal A.
System Data B.
The contractor shall submit a 6" x 6" cured system sample which the
contractor has made for verification purposes and finish texture approval. C.
Contractor Experience D.
It is the intention of this Section to provide the products as named.
Substitutions will be considered only when received by the Architect, Engineer
or Design Professional through a bidding Prime Contractor at least ten days
prior to the date set for receipt of bids. Upon receipt of any such submission,
the Architect, Engineer or Design Professional will determine whether or not the
proposed product is an equal. In the event the Architect, Engineer or Design
Professional determines that a proposed system is an approved equal, he will
issue an addendum and notify all bidders at least 48 hours prior to receipt of
bids. No substitutions will be considered after contract bid date. E.
The contractor shall submit a copy of the manufacturer’s packing slip, tagged
for this specific job, along with calculations, signed by an officer of the
primary material supplier demonstrating that the quantity of material furnished
for the project will achieve the specified coverage and mil thicknesses. 1.06
Material Delivery, Handling and Storage A.
Primary system materials shall be delivered in the manufacturer's undamaged,
unopened containers. Each container shall be clearly marked with the following: B.
Provide equipment and personnel to handle the materials by methods which prevent
damage. C.
The contractor shall promptly inspect direct jobsite material deliveries to
assure that quantities are correct, comply with requirements and are not
damaged. D.
The contractor shall be responsible for materials furnished by him, and he shall
replace, at his own expense, such materials that are found to be defective in
manufacture or that have become damaged in transit, handling or storage. E.
Store material(s) in accordance with manufacturer’s instructions, with seals
and labels intact and legible. Maintain temperatures within the required range.
Do not use materials which exceed the manufacturer’s maximum recommended shelf
life. 1.07
Job Conditions A.
The contractor shall visit the jobsite prior to beginning the installation of
the Epoxy Floor Coating System to evaluate substrate condition, including
substrate moisture content, and the extent of repairs required, if any. Concrete
substrates shall be tested to verify that the moisture content of the substrate
does not exceed Epoxy Floor Coating System manufacturers' recommendations. Cost of repair and remediation
of the substrate can not be predicted prior to inspection and testing, and therefore
is not encompassed within the installation estimates. B.
The contractor should exercise care during surface preparation and system
installation to protect surrounding substrates and surfaces, as well as in-place
equipment. The contractor shall prepare the substrate to remove laitance and
open the surface. This shall be achieved by light brush grit blasting. Surface
profile achieved shall be similar to medium grit sandpaper and free from
bond-inhibiting contaminants. Costs incurred that are associated with damage
from negligence or inadequate protection shall be the sole responsibility of the
contractor. C. Subfloor
tolerances are specified in Section __________ (in accordance with ACI 302).
Each drain in the installation area must be working and raised or lowered to the
actual finished elevation of the Industrial Coating System. D.
System must be protected by the General Contractor or, as a separate bid item,
by the installing contractor until it is inspected and turned over to the owner. E.
The minimum slab temperature must be conditioned to 50°F before commencing
installation, during installation, and for at least 72 hours after installation
is complete. F. Maintain
lighting at a minimum uniform level of 50 or more foot candles in areas where
the Epoxy Floor Coating System is being installed. It is the recommendation
of the manufacturer that the permanent lighting be in place and working during
the installation. G.
Leaks from pipes and other sources must be corrected prior to the installation
of the Epoxy Floor Coating System. Part
2 - Products 2.01
Materials A.
System Overview B.
Typical Physical Properties @ 73°F (unless otherwise noted)
Typical Physical Properties
Mix
Ratio A:B 2:1 Color
Standard
Colors Viscosity, mixed 130 ku Solids,
by volume 100% VOC
(Volatile Organic Content) -0- Coverage @10 mils 160 sq. ft. Pot Life, 1 gallon mass @ 50°
F 185 minutes Cure Time @ 6 mils
Dry to touch 8-9 hours Abrasion Resistance 0.1 grams lost Hardness, Shore D 65 Resistance to No slip or flow at required temperature of
158°F Adhesion
350 psi ACI
503R 100%
concrete failure Flammability Self-Extinguishing over concrete Gloss 90 + millage pts Part
3 - Execution 3.01
Surface Preparation A.
For thorough instructions regarding preparation of concrete substrates consult
General Polymers "Instruction for Concrete Surface Preparation" (Form
G-1). 3.02
Installation A.
General B.
Cracks C. Control
Joints D.
Isolation/Expansion and Other Joints Subject to Movement E.
System Primer F.
First Coat
3.03
Curing, Cleaning and Protection A.
Cure Epoxy Floor Coating System materials in compliance with manufacturer's
directions, taking care to prevent contamination during stages of the
installation and prior to completion of the curing process. B.
Protect the Epoxy Floor Coating System from damage and wear during other
phases of the construction operation, using temporary coverings as recommended
by the manufacturer, if required. Remove temporary covering just prior to final
inspection. C. Clean
the Epoxy Floor Coating System just prior to final inspection, using
materials and procedures suitable to the system manufacturer. Some cleaners will
affect the color, gloss or texture of your polymer floor surfaces. To determine
how your cleaner will perform, General Polymers recommends that you first test
each cleaner, in a small area, utilizing your cleaning technique. This
precaution will demonstrate the effect of your cleaner and technique. If no
deleterious effects are observed, continue with the procedure. If deleterious
effects do occur, modify the cleaning material and/or procedure. For
recommendations regarding types of cleaners, contact the Epoxy Floor Coating System manufacturer.
Revised: 4/02
3543 Polyamide Epoxy Semi-Gloss
3547 Polyamide Epoxy Flat
3744P High Performance CR Epoxy
Obtain Industrial Coating materials from a single manufacturer with a minimum of
_____ years verifiable experience providing materials of the type specified in
this section.
Installation must be performed by a manufacturer certified contractor with
skilled mechanics having not less than three years satisfactory experience in
the installation of the type of system as specified in this section, and must be
certified in writing by the manufacturer of the Epoxy Floor Coating System.
Submit manufacturer's specifications on cured system and individual components
of the Epoxy Floor Coating System, including physical properties and performance
properties and tests described in part 2.01 B and submit Material Safety Data
Sheets. Each individual component of the system will be evaluated on the basis
of these standards. For any tests not listed in the manufacturer's standard
nationally published data, the manufacturer must supply the missing data
accompanied by the independent testing laboratory's test results which prove
compliance in accordance with the referenced standard(s). Furnish _____ sets of
this information. Manufacturer's standard color chart shall also be submitted
and must afford the owner color selection from at least _____ standard colors
and computerized custom color matching shall be available upon request. Furnish
____ sets of this information.
The contractor shall furnish a list of projects using either specified material
or equivalent that they have installed during the last _____ years. Information
shall include: project name, square footage, owner contact name with owner’s
address and phone number. Also, the contractor shall furnish resumes detailing
the experience of key project personnel including supervisors and mechanics.
•Product name(s) and/or Number(s)
•Manufacturer's name
•Component designation (A, B, etc.)
•Product Mix Ratio
•Health and Safety Information
•CHEMTREC Emergency Response Information
The Epoxy Floor Coating System as formulated by General Polymers shall be
Epoxy Floor Coatings, consisting of 3578 Universal Penetrating
Primer as primer and Epoxy Floor Coatings. The total system
thickness will be 16-18 mils DFT nominal.
Computerized custom color matching available upon request
ASTM D 2471
@ 73° F
@ 90° F
40 minutes
20 minutes
Recoat
Light Traffic
Full Cure
14 hours min.
24 hours min.
7 days
ASTM D 4060
ASTM D 2240
Elevated Temperatures
ASTM D 635
60° Gloss Meter
@ 73°F, 50% RH
Apply each component of the Epoxy Floor Coating System in compliance with
manufacturer's written installation instructions and strictly adhere to mixing
and installation methods, recoat windows, cure times and environmental
restrictions. The Epoxy Floor Coating System is to be installed directly
over non-moving control joints and cracks which have been treated with
semi-rigid epoxy and the Epoxy Floor Coating System will terminate at the
edge of isolation and expansion joints as designated by the Architect, Engineer
or Design Professional. Integral cove base shall be installed where specified in
the drawings.
For information pertaining to the treatment of cracks in concrete substrates,
consult General Polymers Concrete 102.
For information pertaining to the treatment of control joints in concrete
substrates, consult General Polymers Concrete 103.
For information pertaining to the above, consult General Polymers Concrete 105.
3578 Universal Penetrating Primer
Epoxy Floor Coatings